Insulation bridging set

for insulated ceilings, thickness >100 mm

Example for bridging set:
1 Mounting screw
2 Joint
3 Threaded rod
4 Nuts

Varianti di prodotto e stock

Articolo n. Stock ProdottoPeso [kg]Unità di imballaggioGTIN / EAN
4000738
Ü-Set 400 mm11.6 kg100 kits40393910211054

Specifiche tecniche

Bridging set for mounting Datwyler clamps on insulated ceilings - insulation thickness: higher than 100 mm. Borehole depth = x+y. Embedment depth in concrete (x): minimum of 70 mm, plus thickness of non-flammable insulation (y).
Threaded rods delivered 0,5 m or 1 m in length - must be cut to the requested length (y = thickness of insulation). A thread cutting device which causes no flying sparks and provides a stop for equal lengths is available from specialised retailers.
Maybe the plasterboarder can help you, too. You can use a 6 mm drill and mounting tools from specialised retailers.
Bridging Set is also suitable for >400 mm. Threaded rod must be cut accordingly.
A dril for borehole depths >400 mm is necessary!
The suspensions take 0.15 kN for fire resistance F90.

Documentazione